
Fifteen years cutting pads, holding grade, and hauling under DOT permit across Southeast Michigan. When the number is in the hundreds of thousands of yards, developers call us first.
Same 38 acres. Fourteen weeks apart. Drag the handle — this is what 412,000 cubic yards of cut looks like when it leaves on schedule.



Bulk cut and haul at production rates other outfits can't touch. 90-ton class excavators, articulated fleets, GPS load counts.

GPS machine-control dozers holding final grade to ±0.1 ft. Pads certified, signed, and ready for concrete the day we leave.

Storm, sanitary, and water mains trenched, bedded, and tested in-house. No sub-of-a-sub on your critical path.

Certified erosion control specialists on staff. SESC plans, silt fence, basins, inspections — your permit stays clean through every storm event.

Structures down, stumps out, debris hauled under our own DOT authority. From standing building to blank dirt in one contract.
Every Monolith client gets a live site tracker: milestone dates and weekly drone checkpoints. No phone tag. No “how's it looking out there.” This is a live sample.

38 acres cleared and grubbed. 2,100 tons of debris hauled off-site under our own DOT authority.

412,000 CY of cut moved at production rate — 90-ton excavators loading a dedicated articulated haul fleet.

GPS machine-control dozers holding final grade to ±0.1 ft across all 47 lots. Weekly grade reports issued to owner.

Storm, sanitary and water mains — 9,400 LF trenched, bedded, and pressure-tested in-house.

Certified final grade, SESC closeout, basin stabilization — pad turnover with signed grade certification.
Forty-plus company-owned machines. Nothing on your critical path waits on a rental counter.
Your schedule doesn't survive a shutdown. Neither does your insurance rate. Our record is why GCs put us on their hardest sites.




Send us your plans. You'll have a real number — cut, fill, haul, and schedule — within 72 hours. No tire-kicking, no fluff estimates.